2nd_addition
1: Looking SE - light snow cover - 2x4 structures are for string lines.
2: DSC00836.JPG
3: DSC00837.JPG
4: Forms to extend foundation and tie to wall. Temp roof drain.
5: Foundation extention - note horizontal 2x4 for string lines.
6: What a mess!
7: DSC00841.JPG
8: DSC00897.JPG
9: Footing forms
10: Sting lines in use
11: Rebar glued into wall and cross tied.
12: DSC00902.JPG
13: Lots of form work - has to be strong to resist hydraulic force.
14: Nikolaus inspects project
15: Lots of details to take care of.
16: Complicated support system holds up carport roof. See 2 posts on right.
17: Jack stand holding roof.
18: Quite a support mess holding up carport roof.
19: DSC00909.JPG
20: DSC00910.JPG
21: DSC00911.JPG
22: Truck ready to pour Foundation. Pile of posts.
23: DSC00915.JPG
24: What have I gotten in to?
25: Should have just used more concrete...
26: DSC00918.JPG
27: Ready for the Pour.
28: DSC00920.JPG
29: Footing extension and wall tie poured.
30: ICF (Insulated Concrete Forms) on top of foundation ready for stubwall pour.
31: DSC00929.JPG
32: DSC00930.JPG
33: DSC00931.JPG
34: You can see the footing below the stub wall.
35: DSC00939.JPG
36: DSC00944.JPG
37: DSC00945.JPG
38: DSC00973.JPG
39: Ready to pour Floor and stub wall
40: DSC00976.JPG
41: Concrete truck unfolding
42: DSC00978.JPG
43: DSC00980.JPG
44: DSC00981.JPG
45: The pour begins
46: DSC00983.JPG
47: DSC00984.JPG
48: DSC00985.JPG
49: DSC00986.JPG
50: Steel arrived and I've rolled it off the truck
51: DSC01054.JPG
52: Steel lined up to move on to posts.
53: A temple of posts
54: DSC01057.JPG
55: Tearing out brick sidewalk
56: DSC01059.JPG
57: Temporary downspout - water drainage was a constant nightmare.
58: DSC01061.JPG
59: mounts that hold post base plates.
60: With this system, I could tilt the post and set the height
61: Water line level did not work well in the sun!
62: Welded a lift point - did not work well and wasn't safe.
63: The roll around crane I made and first beam getting into position.
64: Note the Engine lift frame - much better way to grab a beam.
65: Good view of my crane
66: Second beam up
67: Readjusting first beam Everything has to match up to an 1/8th of an inch.
68: Cutting. lifting, placing, welding these stubs took forever.
69: DSC01150.JPG
70: Power line would get in the way. Extension on crane for placing stubs.
71: DSC01152.JPG
72: DSC01153.JPG
73: DSC01161.JPG
74: DSC01164.JPG
75: DSC01165.JPG
76: Note crane counter weight.
77: DSC01168.JPG
78: Steel painted white!
79: DSC01350.JPG
80: DSC01351.JPG
81: DSC01352.JPG
82: More brace points - lots of welds.
83: DSC01354.JPG
84: DSC01355.JPG
85: DSC01479.JPG
86: DSC01480.JPG
87: Power trench
88: DSC01482.JPG
89: DSC01484.JPG
90: Sidewalk layout looking North
91: DSC01485.JPG
92: Door way looking West
93: Sidewalk layout from drive looking SE
94: DSC01487.JPG
95: Decking arrived getting placed
96: Sidewalk
97: Decking part way on -
98: Almost ready to pour.
99: placing decking
100: First second in place
101: dsc01495.jpg
102: dsc01496.jpg
103: dsc01497.jpg
104: curved setup by planter
105: dsc01499.jpg
106: Rebar in place
107: dsc01501.jpg
108: dsc01502.jpg
109: dsc01503.jpg
110: Concrete truck with boom hanging over roof
111: Concrete truck boom - amazing machine.
112: dsc01506.jpg