DSC00976.JPG (40/112):
39: Ready to pour Floor and stub wall
38: DSC00973.JPG
37: DSC00945.JPG
36: DSC00944.JPG
35: DSC00939.JPG
34: You can see the footing below the stub wall.
33: DSC00931.JPG
32: DSC00930.JPG
31: DSC00929.JPG
30: ICF (Insulated Concrete Forms) on top of foundation ready for stubwall pour.
41: Concrete truck unfolding
42: DSC00978.JPG
43: DSC00980.JPG
44: DSC00981.JPG
45: The pour begins
46: DSC00983.JPG
47: DSC00984.JPG
48: DSC00985.JPG
49: DSC00986.JPG
50: Steel arrived and I've rolled it off the truck