DSC00944.JPG (36/112):
35: DSC00939.JPG
34: You can see the footing below the stub wall.
33: DSC00931.JPG
32: DSC00930.JPG
31: DSC00929.JPG
30: ICF (Insulated Concrete Forms) on top of foundation ready for stubwall pour.
29: Footing extension and wall tie poured.
28: DSC00920.JPG
27: Ready for the Pour.
26: DSC00918.JPG
37: DSC00945.JPG
38: DSC00973.JPG
39: Ready to pour Floor and stub wall
40: DSC00976.JPG
41: Concrete truck unfolding
42: DSC00978.JPG
43: DSC00980.JPG
44: DSC00981.JPG
45: The pour begins
46: DSC00983.JPG