DSC00932.JPG (34/112):
You can see the footing below the stub wall.
33: DSC00931.JPG
32: DSC00930.JPG
31: DSC00929.JPG
30: ICF (Insulated Concrete Forms) on top of foundation ready for stubwall pour.
29: Footing extension and wall tie poured.
28: DSC00920.JPG
27: Ready for the Pour.
26: DSC00918.JPG
25: Should have just used more concrete...
24: What have I gotten in to?
35: DSC00939.JPG
36: DSC00944.JPG
37: DSC00945.JPG
38: DSC00973.JPG
39: Ready to pour Floor and stub wall
40: DSC00976.JPG
41: Concrete truck unfolding
42: DSC00978.JPG
43: DSC00980.JPG
44: DSC00981.JPG