(64/116) 2025-03-17_17-10-53.jpg
lube-pump disassembled.
63: Lube-pump Piston end.
62: Kiln reassembled and the mortar fired - the grey turns to light pink.
61: Ground down a deditcated wrench for the pencil air grinder.
60: Ground down a deditcated wrench for the pencil air grinder.
59: Ground down a deditcated wrench for the pencil air grinder.
58: Assembling the lube meters stack.
57: Assembling the lube meters stack
56: Assembling the lube meters stack
55: Assembling the lube meters stack
54: Making bracket for lube meters. One of the holes was in the wrong place!
65: Nice center closing vise.
66: Nice center closing vise.
67: Nice center closing vise. Pins for mounting it.
68: Scketchy setup - These grinding disks aren't made with the 1.25" hole.
69: Scketchy setup - These grinding disks aren't made with the 1.25" hole.
70: Tiny soldering iron with computerized controls
71: Just a hair to small so I had to bore out 21 and 22mm
72: Just a hair to small so I had to bore out 21 and 22mm. Used a bit of spray and wipe for coolant.
73: First time I used this asian boring head - mounted on a kwik-switch-200. Works well. Not a Wohlhaupter, but works.
74: Color coded my sockets.