(61/189) 2025-03-14_18-02-02.jpg
Kiln reassembled and the mortar fired - the grey turns to light pink.
60: Ground down a deditcated wrench for the pencil air grinder.
59: Ground down a deditcated wrench for the pencil air grinder.
58: Ground down a deditcated wrench for the pencil air grinder.
57: Assembling the lube meters stack.
56: Assembling the lube meters stack
55: Assembling the lube meters stack
54: Assembling the lube meters stack
53: Making bracket for lube meters. One of the holes was in the wrong place!
52: Making bracket for lube meters
51: 2025-03-11_20-33-35.jpg
62: Lube-pump Piston end.
63: lube-pump disassembled.
64: Nice center closing vise.
65: Nice center closing vise.
66: Nice center closing vise. Pins for mounting it.
67: Scketchy setup - These grinding disks aren't made with the 1.25" hole.
68: Scketchy setup - These grinding disks aren't made with the 1.25" hole.
69: Tiny soldering iron with computerized controls
70: Just a hair to small so I had to bore out 21 and 22mm
71: Just a hair to small so I had to bore out 21 and 22mm. Used a bit of spray and wipe for coolant.