(58/165) 2025-03-13_19-21-47.jpg
Ground down a deditcated wrench for the pencil air grinder.
57: Assembling the lube meters stack.
56: Assembling the lube meters stack
55: Assembling the lube meters stack
54: Assembling the lube meters stack
53: Making bracket for lube meters. One of the holes was in the wrong place!
52: Making bracket for lube meters
51: 2025-03-11_20-33-35.jpg
50: We can see the new 4mm push-to-connect fittings. (I changed them out for all metal stainless later.)
49: Looks like it was getting plenty of way lube.
48: Time for a nap underneath the milling table..Turns out it was a copper line!
59: Ground down a deditcated wrench for the pencil air grinder.
60: Ground down a deditcated wrench for the pencil air grinder.
61: Kiln reassembled and the mortar fired - the grey turns to light pink.
62: Lube-pump Piston end.
63: lube-pump disassembled.
64: Nice center closing vise.
65: Nice center closing vise.
66: Nice center closing vise. Pins for mounting it.
67: Scketchy setup - These grinding disks aren't made with the 1.25" hole.
68: Scketchy setup - These grinding disks aren't made with the 1.25" hole.