(68/189) 2025-03-20_19-53-07.jpg
Scketchy setup - These grinding disks aren't made with the 1.25" hole.
67: Scketchy setup - These grinding disks aren't made with the 1.25" hole.
66: Nice center closing vise. Pins for mounting it.
65: Nice center closing vise.
64: Nice center closing vise.
63: lube-pump disassembled.
62: Lube-pump Piston end.
61: Kiln reassembled and the mortar fired - the grey turns to light pink.
60: Ground down a deditcated wrench for the pencil air grinder.
59: Ground down a deditcated wrench for the pencil air grinder.
58: Ground down a deditcated wrench for the pencil air grinder.
69: Tiny soldering iron with computerized controls
70: Just a hair to small so I had to bore out 21 and 22mm
71: Just a hair to small so I had to bore out 21 and 22mm. Used a bit of spray and wipe for coolant.
72: First time I used this asian boring head - mounted on a kwik-switch-200. Works well. Not a Wohlhaupter, but works.
73: Color coded my sockets.
74: Never though I would use this mag base as much as I do.
75: easy to move now.
76: Asking for trouble - 1mm carbide drill
77: put a cone for starting taps.
78: Reversing tap started for pointed end taps.