(155/364) 2023-04-21_18-22-31.jpg
Super close up of a ding on the milling machine table. You can see the shinny bit the PGS left.
154: Next - need to make knobs.
153: Snugs are finished. Nice positive action.
152: Just need to flip it over and shave off the bottom..
151: 2023-04-14_22-29-38.jpg
150: 2023-04-14_21-52-23.jpg
149: Finally doing the profiling on the indicator stand joint
148: 3d Printed a holder for my Double-taper Y collets.
147: Dereeling set up for the wire-cut/strip machine. I use a torid inductor as a damping weight - then the wire goes over a spool the is supported by elastic cords. The motion of the wire is jerky - would jam or tangle - this works.
146: Printing MT3 din-rail holder for the lathe.
145: Snubs turned out well.
156: Making the sleeve for the joint.
157: Not much room for turning the cone.
158: The cone end finished
159: Sleves finished turning. Will drill the cross holes later.
160: A 3D print went very bad..
161: Starting tap
162: 2023-04-23_17-30-49.jpg
163: Sleevs and barrels
164: Sleevs and barrels
165: 2023-04-23_22-49-28.jpg