(42/364) 2023-01-25_20-50-01.jpg
41: Tool path.
40: Connected to RF power amp
39: Added RF connector to FM transmitter
38: Finished printing the ER40 collet holders.
37: lapped down to 2.5um
36: Only 23um [.0009"\
35: Trying aluminum foil on groved plate. Does not wear long - too thin.
34: A good ground clamp
33: Had to weld this Stainless back together..
32: Lapping block to brighten it up. Groved iron plate with polycarbonate sheet - 20um diamond paste.
43: Screwed up - cut a bit deep into the aluminum, probably just as well - don't want to cut the 1095 spring-steel with the corner.
44: 2023-01-25_20-55-59.jpg
45: got close enough to the screw head to make me nervous.
46: Clearance is clearance..
47: Much better
48: Waiting for the 80TPI screw.
49: Some of what came out of the BRAND-NEW Precision-Mathews lathe transmission.
50: Once again
51: Moving to big bench
52: OK - found my good parrellel ( flat on all sides unlike my other ones) It Rocks!!! I think I finaaly figgured out my problem.