(25/325) 2022-04-14_13-09-09.jpg
Meger tooling that was to come with the EMCO lathe I decided not to get
24: Meger tooling that was to come with the EMCO lathe I decided not to get
23: Meger tooling that was to come with the EMCO lathe I decided not to get
22: Meger tooling that was to come with the EMCO lathe I decided not to get
21: Bench feet - button head with nut locktited on for adjustment.
20: Bench feet - button head with nut locktited on for adjustment.
19: Decking vice anvil..
18: Milling sphere to mate with button head screws for bench feet.
17: Milling sphere to mate with button head screws for bench feet.
16: Sold this - worked well but requires a cell phone that will become obsolete. Will replace with a stand alone unit.
15: Sold this - worked well but requires a cell phone that will become obsolete. Will replace with a stand alone unit.
26: Meger tooling that was to come with the EMCO lathe I decided not to get
27: Meger tooling that was to come with the EMCO lathe I decided not to get
28: 2022-04-14_21-48-06.jpg
29: Working on installing 20 Ton press into the bench.
30: Mini-Din rail to install accordian gaurding for the mill
31: 20 Ton Press install finished.
32: Bench upgrade is finished.. Shelf height matches saw height.. Saw fits under the overhang.. Under bench lighting on floor and shelf.
33: Replacement of the pnematic drain valve - GSP threads made this a pain - probably should have re-threaded it.. Here you can see all the fittings - needs to have a prefilter with settling or it won't last long at all.
34: Replacement of the pnematic drain valve - GSP threads made this a pain - probably should have re-threaded it.. BSP needs a gasket to seal -
35: Replacement of the pnematic drain valve This is the old one - worked for years, but impossible to maintain.