(34/325) 2022-04-23_19-47-31.jpg
Replacement of the pnematic drain valve - GSP threads made this a pain - probably should have re-threaded it.. BSP needs a gasket to seal -
33: Replacement of the pnematic drain valve - GSP threads made this a pain - probably should have re-threaded it.. Here you can see all the fittings - needs to have a prefilter with settling or it won't last long at all.
32: Bench upgrade is finished.. Shelf height matches saw height.. Saw fits under the overhang.. Under bench lighting on floor and shelf.
31: 20 Ton Press install finished.
30: Mini-Din rail to install accordian gaurding for the mill
29: Working on installing 20 Ton press into the bench.
28: 2022-04-14_21-48-06.jpg
27: Meger tooling that was to come with the EMCO lathe I decided not to get
26: Meger tooling that was to come with the EMCO lathe I decided not to get
25: Meger tooling that was to come with the EMCO lathe I decided not to get
24: Meger tooling that was to come with the EMCO lathe I decided not to get
35: Replacement of the pnematic drain valve This is the old one - worked for years, but impossible to maintain.
36: Replacement of the pnematic drain valve - Intalled - The settling bowl and filter keeps the valve working.
37: I think I like this Chamfering tool - fine adjustment in mm- replaceable carbide cutter.
38: Updated - had to sew more accordian on the right side - chips can fall on a prox-detector and cause a crash on homing. Will add an elastic bit to help retract so it dosen't get bunched up. Not easy to clean- - but keeps the ways clean.
39: Example of HDR messing up - double image.
40: Testing the cut depth
41: Broken straight edges
42: Broken straight edges
43: cutting
44: 2022-05-03_18-17-28.jpg