(160/235) 2025-06-08_17-05-54.jpg
Replacing oil - slow sphon.
159: Changing oil in lathe - break-in is over - the magnets I put in the oil path did their job - big one on the bottom of the tank as well.
158: 2025-06-02_16-33-33.jpg
157: 2025-06-02_16-29-02.jpg
156: 2025-05-31_11-59-34.jpg
155: 2025-05-28_21-23-43.jpg
154: Threaded sleeve pressed on to match C5. It expanded the sleeve enough had to take off a bit.. PITA
153: 2025-05-27_18-39-09.jpg
152: Doggy set up to mill key-slop
151: C5 collett to ER32 conversion - made a ring to match the old
150: Boring out to press on to the ER32 shaft
161: Tim's recording studio progress - floor is complicated.
162: Tim's recording studio progress - sloping roof - walls should not be parrallel?
163: Tim's recording studio progress - special windows.
164: Printed this vacuum aspirator - didn't really work.. To small a hole.
165: I've been collecting some glass ware for doing some chemisty work.
166: I've been collecting some glass ware for doing some chemisty work.
167: Documenting my Tig button controller
168: Documenting my Tig button controller
169: Federal 230 gage heads
170: Federal 230 gage heads - washer stack setup.