(155/165) 2025-05-28_21-23-43.jpg
154: Threaded sleeve pressed on to match C5. It expanded the sleeve enough had to take off a bit.. PITA
153: 2025-05-27_18-39-09.jpg
152: Doggy set up to mill key-slop
151: C5 collett to ER32 conversion - made a ring to match the old
150: Boring out to press on to the ER32 shaft
149: C5 collett to ER32 conversion - made a ring to match the old
148: Thread cutting M30-1.0
147: Some lathe work
146: Disassembly of D-bit grinder
145: Disassembly of D-bit grinder
156: 2025-05-31_11-59-34.jpg
157: 2025-06-02_16-29-02.jpg
158: 2025-06-02_16-33-33.jpg
159: Changing oil in lathe - break-in is over - the magnets I put in the oil path did their job - big one on the bottom of the tank as well.
160: Replacing oil - slow sphon.
161: Tim's recording studio progress - floor is complicated.
162: Tim's recording studio progress - sloping roof - walls should not be parrallel?
163: Tim's recording studio progress - special windows.
164: I've been collecting some glass ware for doing some chemisty work.
165: I've been collecting some glass ware for doing some chemisty work.